Sanibel Causeway Emergency Restoration: As a part of the Florida Department of Transportation’s (FDOT) Emergency Restoration of the Sanibel Causeway, crews continue work on McGregor Boulevard and the Sanibel Causeway from Port Comfort Road to Sanibel Island. The causeway islands surrounding the temporary roadway are an active work zone and are currently closed for public access, including from the water.
- Motorists should be aware that through October and November, portions of the travel lanes near the bridges on the Causeway will be narrowed to 10 feet with a one-foot shoulder and barrier wall on each side. Oversized loads will only be permitted during the nighttime/overnight hours with this restriction.
- During the overnight/nighttime hours on Sunday, Oct. 1, crews will shift the travel lanes on the first causeway island to the temporary roadway. Motorists should expect delays during the overnight hours. This shift is necessary for crews to raise the elevation of the existing/permanent road approximately 2 feet.
- During the hours of 6:30-11 a.m., motorists leaving Sanibel should expect eastbound McGregor Boulevard to be reduced to one lane from just east of the toll plaza to Port Comfort Road. This closed lane will be used as a dedicated lane for concrete delivery trucks arriving to the project. Concrete trucks will be escorted by FHP when using this lane. During this time, motorists traveling to Sanibel should expect FHP to intermittently stop traffic to allow concrete trucks to cross westbound travel lanes to reach the staging area.
- Motorists should expect isolated flagging operations on the Causeway. Crews anticipate opening all lanes between the hours of 7-9 a.m. and 3-5 p.m.
- Motorists should expect uneven road surface on the causeway through the end of the year. The contractor continuously monitors road conditions and is prepared to make repairs as needed.
- Crews are relocating utilities along McGregor Boulevard. Motorists are asked to use caution as work activities may be close to the roadway.
- Crews continue driving sheet pile on the causeway islands.
- Motorists should expect numerous dump trucks entering and exiting Punta Rassa. They are delivering armor stone to be used throughout the project.
- Motorists should expect periodic daytime delays for delivery/removal of materials, transfer of equipment, and for crews to remove trash from the roadway.
- Many oversized vehicles are crossing the causeway to assist with recovery efforts on the island. Please be patient as travel may be slower than usual. Bicyclists are encouraged to utilize another mode of transportation to travel the causeway, and pedestrians are not permitted on the Sanibel Causeway. Expect shoulder closures throughout the project.
MOTORISTS ARE REMINDED TO OBEY THE POSTED SPEED LIMIT OF 20 MPH. Please use caution and watch for workers and construction vehicles entering and leaving the roadway.
For further questions, please contact Jennifer Dorning by email at [email protected] or by phone at (239) 338-7723. Please visit www.swflroads.com/SanibelCauseway for additional information.