Skip to the content
LeAneSUAREZgroup
  • Home
  • Listing
    • Advanced Search
    • Featured Listings
    • Rental Concierge
  • Communities
    • Captiva Island
    • South Seas Resort
    • Fort Myers
    • Fort Myers Beach
    • Bonita Springs
    • Cape Coral
    • Naples
    • Marco Island
  • Our Story
    • Real Estate
    • SUAREZFamilyofCompanies
    • Construction
    • List with Us
    • Offices
    • Testimonials
  • Resources
    • The Coastline Journal
    • SWFL Market Report
    • SWFL Golf Guide
    • Christie’s Luxury Living Magazine
    • COMMUNITY PARTNERS
    • HomeLook Magazine
    • SANIBEL & CAPTIVA WEBCAMS
    • Local Weather Forecast
    • CAPTIVA ISLAND INFORMATION
    • SANIBEL ISLAND INFORMATION
    • BUYING
    • SELLING
    • FIRPTA – INFO
    • 1031 TAX DEFERRED EXCHANGE
    • COMMUNITY PAGE
  • Sign Up
  • Login
My Account

FDOT Provides Update on Sanibel Causeway Project

The Florida Department of Transportation (FDOT) has announced that traffic has been successfully moved to the permanent lanes on the Sanibel Causeway. The surrounding causeway islands are currently an active work zone and are closed to public access, including access from the water.

WEST FROM TOLL PLAZA

  • Protected Birds: Beach-nesting birds are present on the Causeway Islands. Drivers are advised to slow down and stay alert as birds may be flying near the roadway.
  • Traffic Interruptions: Expect intermittent traffic stops at the staging area entrance as equipment and materials cross the road for work on the south side of McGregor Boulevard.
  • Ongoing Construction: Crews are continuing earthwork and debris removal along the Causeway Islands. Construction equipment will occasionally enter and leave the travel lanes. The contractor aims to minimize interruptions during peak hours.
  • Westbound Merge: The westbound merge point is located west of the toll plaza. Drivers should exercise caution and adhere to the 20 mph speed limit. Construction vehicles and equipment are frequently entering and exiting the staging area near this location.
  • U-Turn Work: Crews are also working on the off-island U-turn area under Span A.

EAST FROM TOLL PLAZA

  • Upcoming Lane Closures: Starting late next week, motorists should expect temporary lane closures as crews prepare for a new McGregor traffic pattern.
  • Lane Reductions: Later this summer, traffic will be reduced to one lane in each direction on McGregor for about half a mile near Port Comfort Road. This is to allow crews to reconstruct a pipe crossing. Traffic will shift between the north and south sides as work progresses. Further details will be provided once the schedule is finalized.
  • Eastbound Travel: One lane of eastbound travel will remain from the toll plaza to Shell Point Road on the south (beach) side of McGregor. The south/beach shoulder will remain fully closed to allow for the installation of marine mattresses to reinforce the shoreline. This closure will continue through the summer. The contractor may use this lane for materials delivery intermittently.
  • Westbound Delays: Westbound motorists on McGregor may experience brief delays as the Florida Highway Patrol stops vehicles to allow materials deliveries to access the staging area at Punta Rassa.

Additional Notes

Many oversized vehicles are using the causeway to aid recovery efforts on the island, leading to slower travel times. Bicyclists are encouraged to find alternative transportation, and pedestrians are not permitted on the causeway. Motorists are reminded to obey the posted 20 mph speed limit throughout the work zone.

For more information about the project, visit Sanibel Causeway Project

RECENT BLOGS

Camino de Sanibel registration

Get Ready: Camino de Sanibel Registration Opens Nov. 2 for 2027 Walk

October 30, 2026 No Comments

The highly anticipated Camino de Sanibel registration opens Nov. 2, offering residents and visitors a deeply moving opportunity to cross the entire barrier island on

Read More »
By the Sea Condominiums Sanibel 2026

Milestone Reached: By the Sea Condominiums Sanibel 2026 Rebuild Ahead of Schedule

October 30, 2026 No Comments

A major construction milestone was celebrated last week on the barrier islands as the By the Sea Condominiums Sanibel 2026 redevelopment project officially reached its

Read More »
JOG N JAM

JOG N JAM 2026: Run, Rock, and Give Back in Sanibel

October 30, 2026 No Comments

The JOG N JAM is officially returning to the Gulf coast next month, and this highly anticipated annual tradition promises to be bigger and better

Read More »
Generosity Breakfast

Generosity Breakfast: 2026 Sanibel Milestone Celebrating Giving

October 30, 2026 No Comments

The Generosity Breakfast is officially returning to Sanibel Island this November. Hosted by the Charitable Foundation of the Islands (CFI), this highly anticipated event honors

Read More »
Sanibel Holiday Arts & Craft Fair

Festive Treasures: Experience the 2026 Sanibel Holiday Arts & Craft Fair

October 30, 2026 No Comments

The most wonderful time of the year is officially arriving along the Gulf coast, and there is no better way to kick off the festive

Read More »
Legacy Harbour Marina

$15 Million Triumphant Return: Legacy Harbour Marina Reopens in Fort Myers

October 30, 2026 No Comments

The highly anticipated reopening of Legacy Harbour Marina in Fort Myers marks a monumental milestone for the local boating community and Southwest Florida’s economic resilience.

Read More »

DISCOVER

  • Home
  • Curated Collection
  • Communities
  • The Journal
  • Contact

CONTACT

LeAne Taylor Suarez

+1 239.872.1632

LeAne@LeAneSUAREZ.com

Aleczander M Suarez

+1 239.322.0243

Alec@LeAneSUAREZ.com

CAPTIVA OFFICE

11499 Andy Rosse Lane
Captiva Island, FL 33924

SANIBEL OFFICE

1019 Periwinkle Way
Sanibel, FL 33957

INSIDER ACCESS

Join our inner circle for market previews and SWFL news.

SFOC Logo

LeAneSUAREZGroup

Refining the art of coastal living from Captiva to Naples.

Christie's Masters Circle 2026

© 2026 LeAneSUAREZGroup. All Rights Reserved. | Privacy Policy