Skip to the content
LeAneSUAREZgroup
  • Home
  • Listing
    • Advanced Search
    • Featured Listings
    • Rental Concierge
  • Communities
    • Sanibel Island
    • Captiva Island
    • South Seas Resort
    • Fort Myers
    • Fort Myers Beach
    • Bonita Springs
    • Cape Coral
    • Naples
    • Marco Island
  • Our Story
    • Real Estate
    • SUAREZFamilyofCompanies
    • Construction
    • List with Us
    • Offices
    • Testimonials
  • Resources
    • Blog
    • Christie’s Luxury Living Magazine
    • HomeLook Magazine
    • SANIBEL & CAPTIVA WEBCAMS
    • Local Weather Forecast
    • CAPTIVA ISLAND INFORMATION
    • SANIBEL ISLAND INFORMATION
    • BUYING
    • SELLING
    • FIRPTA – INFO
    • 1031 TAX DEFERRED EXCHANGE
    • COMMUNITY PARTNERS
    • COMMUNITY PAGE
  • Sign Up
  • Login
My Account

Refuge Update: Partial Closure at Bailey Tract for Storm Recovery Construction

The J.N. “Ding” Darling National Wildlife Refuge has announced a temporary closure affecting a portion of the Bailey Tract. Effective this week, the parking lot on Tarpon Bay Road and the boardwalk adjacent to Ani Pond and Airplane Canal are closed to the public to facilitate essential construction activities.

REFUGE DDWS PROJ CLOSURES

This closure is a key step in the ongoing recovery efforts following Hurricane Ian, which made landfall in 2022 and caused significant damage to the refuge’s trail and boardwalk systems.

Building for Resilience

Administration has been working closely with engineers and federal contractors to redesign infrastructure that can better withstand future tropical cyclones. As part of this initiative, the current rehabilitation project involves constructing new concrete boardwalk systems at the Bailey Tract to replace those destroyed or damaged by the storm.

Access and Alternative Parking

While these specific areas are closed, the vast majority of the Bailey Tract and its trail systems remain open for exploration.

Visitors wishing to access the open trails should utilize the parking area adjacent to Smith Pond on Island Inn Road.

Duration and Safety

Construction activities are currently scheduled to last approximately two months. The Refuge administration thanks visitors for their cooperation in respecting all posted closure signage and barriers, which are in place to ensure public health and safety during this period.

Fast Facts: Bailey Tract Closure
  • Closed Areas: Bailey Tract parking lot (Tarpon Bay Road) & boardwalk near Ani Pond/Airplane Canal.

  • Reason: Construction of new, storm-resilient concrete boardwalks.

  • Alternative Access: Trails remain accessible via the Smith Pond parking lot (Island Inn Road).

  • Estimated Duration: Approximately two months.

  • Updates: Visit the Refuge Website or follow their Facebook page for the latest information.

RECENT BLOGS

Noah’s Ark Thrift Shop Sanibel

Noah’s Ark Thrift Shop Sanibel: Updated 2026 Summer Hours

May 1, 2026 No Comments

To help you plan your shopping and decluttering, here is the new operational breakdown for the store located at Saint Michael and All Angels Episcopal

Read More »
Sanibel Fishing Pier Replacement Project

Sanibel Fishing Pier Replacement Project: $2.1M Funding Approved

May 1, 2026 No Comments

To restore public access as quickly as possible, the project has been divided into two distinct phases. This model allows the community to utilize the

Read More »
Punta Rassa Boat Ramp Construction 2026

Punta Rassa Boat Ramp Construction 2026: Erosion Protection Project

May 1, 2026 No Comments

Punta Rassa Boat Ramp Construction 2026 involves the installation of an articulated concrete block mat. This project is a proactive measure by Lee County Parks

Read More »
Kiwanis Diner’s Delight 2026

Kiwanis Diner’s Delight 2026: Your Wallet’s New Best Friend

May 1, 2026 No Comments

The Kiwanis Diner’s Delight 2026 book is valid from May through mid-December, perfectly timed for the upcoming season. Each book is packed with two-for-one coupons,

Read More »
Courtside Steakhouse Reopening

Courtside Steakhouse Reopening: Final Step in Hurricane Recovery

May 1, 2026 No Comments

The Courtside Steakhouse Reopening represents more than just a restaurant launch; it is a symbol of resilience. Chamber President and CEO John Lai noted that

Read More »
Sanibel sea turtle nesting season 2026

Sanibel Sea Turtle Nesting Season 2026: A Hallmark of Island Stewardship

May 1, 2026 No Comments

The Sanibel sea turtle nesting season 2026 has officially arrived, marking a significant milestone for the island’s environmental identity and residential character. On April 30,

Read More »

DISCOVER

  • Home
  • Curated Collecton
  • Communities
  • The Journal
  • Contact

CONTACT

LeAne Taylor Suarez

+1 239.872.1632

LeAne@LeAneSUAREZ.com

Aleczander M Suarez

+1 239.322.0243

Alec@LeAneSUAREZ.com

CAPTIVA OFFICE

11499 Andy Rosse Lane
Captiva Island, FL 33924

SANIBEL OFFICE

1019 Periwinkle Way
Sanibel, FL 33957

INSIDER ACCESS

Join our inner circle for market previews and SWFL news.

SFOC Logo

LeAneSUAREZGroup

Refining the art of coastal living from Captiva to Naples.

Christie's Masters Circle 2026

© 2025 LeAneSUAREZGroup. All Rights Reserved. | Privacy Policy