Skip to the content
LeAneSUAREZgroup
  • Home
  • Listing
    • Advanced Search
    • Featured Listings
    • Rental Concierge
  • Communities
    • Captiva Island
    • South Seas Resort
    • Fort Myers
    • Fort Myers Beach
    • Bonita Springs
    • Cape Coral
    • Naples
    • Marco Island
  • Our Story
    • Real Estate
    • SUAREZFamilyofCompanies
    • Construction
    • List with Us
    • Offices
    • Testimonials
  • Resources
    • The Coastline Journal
    • SWFL Market Report
    • SWFL Golf Guide
    • Christie’s Luxury Living Magazine
    • COMMUNITY PARTNERS
    • HomeLook Magazine
    • SANIBEL & CAPTIVA WEBCAMS
    • Local Weather Forecast
    • CAPTIVA ISLAND INFORMATION
    • SANIBEL ISLAND INFORMATION
    • BUYING
    • SELLING
    • FIRPTA – INFO
    • 1031 TAX DEFERRED EXCHANGE
    • COMMUNITY PAGE
  • Sign Up
  • Login
My Account

A Village Icon Returns: Captiva Island Inn Rebuild Andy Rosse Lane Welcomes Guests

Four years after Hurricane Ian caused catastrophic storm surge across Captiva’s historic village district, one of the island’s most recognizable hospitality staples is back. The Captiva Island Inn rebuild Andy Rosse Lane has reached its first major milestone, officially opening its initial five guest suites on September 18, 2026.

Owner Sandy Stilwell Youngquist has invested approximately $6 million to reconstruct the property at 11508 Andy Rosse Lane following the total loss of the original 10 ground-level cottages in September 2022. The reopening is timed to coincide with the annual Island Hopper Songwriter Fest, which features two adjacent Stilwell Youngquist-owned establishments—Keylime Bistro and RC Otter’s Island Eats—as signature festival venues.

At the LeAneSuarezGroup, we view the revival of Andy Rosse Lane as vital to Captiva’s real estate and tourism foundation. Rebuilding historic commercial centers with storm-resilient engineering preserves the relaxed, pedestrian-friendly island character that defines Captiva’s long-term property appeal.

“It’s been a long four years. It’s been something of bringing her inn back to life following the difficult decision to take down the preexisting wood-frame cottages. I have tears coming down my eyes. We’ve been through it all. And with the anniversary, it’s perfect timing to reopen.”

— Sandy Stilwell Youngquist, Owner of Captiva Island Inn

Design & Engineering: Modern Luxury Meets Cottage Charm

Replacing original 60- to 70-year-old wood-frame cottages within Captiva’s specialized zoning framework required creative architectural solutions. General contractor Stevens Construction built the new structures elevated 10 feet above ground level on concrete foundation pilings to satisfy current flood codes.

National architecture firm MHK Architecture, led by national director Mark McLean, designed two primary buildings—an L-shaped structure on the north and a U-shaped structure on the south—that maintain the visual aesthetic of separate historic cottages.

                 CAPTIVA ISLAND INN REBUILD SPECIFICATIONS
  
  [ TOTAL INVESTMENT ] ──► ~$6 Million private reconstruction investment
  [ ELEVATION HEIGHT ] ──► Built 10 feet above grade on pilings for flood surge defense
  [ NORTH BUILDING ]   ──► Jasmine Suites (5 elevated suites; L-shaped configuration)
  [ SOUTH BUILDING ]   ──► Hibiscus Suites (5 elevated suites; U-shaped configuration)
  [ INTERIOR UPGRADES] ──► Vaulted high ceilings, larger full kitchens & luxury baths
  [ EXTERIOR PALETTE ] ──► Historic pastels: pink, yellow, light purple, green & blue

“Due to the existing zoning, it was tough to replace what was there. We did it with one continuous building and changed the colors, just to give it that cottagey feel. We vaulted all the ceilings and worked on giving those small units a much bigger feel. If you’re across the street or coming up from the south end at the Green Flash, it doesn’t necessarily loom over you as one unit.”

— Mark McLean, National Director for MHK Architecture

Suites Breakdown, Pricing & Phased Openings

Rather than individual cottage names, the accommodations are organized into two boutique enclaves. Open green courtyards fronting each building are intentionally preserved to accommodate modernized below-ground infrastructure.

                    RECONSTRUCTION PHASE TIMELINE
  
  [ PHASE 1: COMPLETED ] ──► Jasmine Suites (5 north units open Sept. 18, 2026)
  [ PHASE 2: FINAL WORK] ──► Hibiscus Suites (5 south units complete late Nov. 2026)
  [ FULL CAPACITY ]      ──► 10 total luxury guest units fully operational for season
Suite Collection Opening Date Nightly Rate Range Key Features
Jasmine Suites (North) September 18, 2026

$240 – $284 (Off-season)


$800 (Peak season: Jan–Mar)

Vaulted ceilings, full kitchens, updated baths, elevated balconies
Hibiscus Suites (South) Late November 2026

$240 – $284 (Off-season)


$800 (Peak season: Jan–Mar)

Direct village views, courtyard access, updated coastal layouts

Andy Rosse Lane Village Momentum

Stilwell Youngquist remains a central figure in Captiva’s hospitality corridor. Her portfolio includes Andy Rosse Lane destinations such as Keylime Bistro, RC Otter’s Island Eats, Latte Da Coffee Shop & Ice Cream, Sunshine Seafood Cafe and Wine Bar, and Cantina Captiva.

Reopening the inn ahead of high season restores crucial short-term room capacity to the Village, driving evening foot traffic to surrounding dining, art galleries, and the Gulf beaches at the end of the lane.

“Two of the five new rooms are already booked. Out of all the bad, something good has come out of it. And I’m really thrilled.”

— Sandy Stilwell Youngquist

RECENT BLOGS

Camino de Sanibel registration

Get Ready: Camino de Sanibel Registration Opens Nov. 2 for 2027 Walk

October 30, 2026 No Comments

The highly anticipated Camino de Sanibel registration opens Nov. 2, offering residents and visitors a deeply moving opportunity to cross the entire barrier island on

Read More »
By the Sea Condominiums Sanibel 2026

Milestone Reached: By the Sea Condominiums Sanibel 2026 Rebuild Ahead of Schedule

October 30, 2026 No Comments

A major construction milestone was celebrated last week on the barrier islands as the By the Sea Condominiums Sanibel 2026 redevelopment project officially reached its

Read More »
JOG N JAM

JOG N JAM 2026: Run, Rock, and Give Back in Sanibel

October 30, 2026 No Comments

The JOG N JAM is officially returning to the Gulf coast next month, and this highly anticipated annual tradition promises to be bigger and better

Read More »
Generosity Breakfast

Generosity Breakfast: 2026 Sanibel Milestone Celebrating Giving

October 30, 2026 No Comments

The Generosity Breakfast is officially returning to Sanibel Island this November. Hosted by the Charitable Foundation of the Islands (CFI), this highly anticipated event honors

Read More »
Sanibel Holiday Arts & Craft Fair

Festive Treasures: Experience the 2026 Sanibel Holiday Arts & Craft Fair

October 30, 2026 No Comments

The most wonderful time of the year is officially arriving along the Gulf coast, and there is no better way to kick off the festive

Read More »
Legacy Harbour Marina

$15 Million Triumphant Return: Legacy Harbour Marina Reopens in Fort Myers

October 30, 2026 No Comments

The highly anticipated reopening of Legacy Harbour Marina in Fort Myers marks a monumental milestone for the local boating community and Southwest Florida’s economic resilience.

Read More »

DISCOVER

  • Home
  • Curated Collection
  • Communities
  • The Journal
  • Contact

CONTACT

LeAne Taylor Suarez

+1 239.872.1632

LeAne@LeAneSUAREZ.com

Aleczander M Suarez

+1 239.322.0243

Alec@LeAneSUAREZ.com

CAPTIVA OFFICE

11499 Andy Rosse Lane
Captiva Island, FL 33924

SANIBEL OFFICE

1019 Periwinkle Way
Sanibel, FL 33957

INSIDER ACCESS

Join our inner circle for market previews and SWFL news.

SFOC Logo

LeAneSUAREZGroup

Refining the art of coastal living from Captiva to Naples.

Christie's Masters Circle 2026

© 2026 LeAneSUAREZGroup. All Rights Reserved. | Privacy Policy